BSL III Laboratories

IDAP has worked the Design and Execution of state of the art BSL 3 laboratories with fully automated HVAC system.

The salient features of this HVAC system are automated pressurization control with 100% exhaust, separate dedicated HVAC equipment for individual laboratory, automated temperature control, and exhaust air filtered through HEPA filter bank.

Whilst following the best Engineering practices,  intelligently calculated and specified special Plume fans are deployed to blast exhaust air into the atmosphere up to several meters to keep the surroundings safe from any contamination through laboratory exhaust.

As the indoor air quality is achieved by deploying the sensitive HVAC system fully backed up with an uninterrupted power supply, whilst the floor, the walls, and the ceiling are rendered with seamless finishes. Ante rooms are designed and constructed to achieve the contamination control.

Moreover, the waste of the laboratory has to pass through the STP (Sewage Treatment Plant) before entering into the city drain.



ABOUT US

Infrastructure Development Authority of the Punjab (IDAP) is an autonomous body established under the Infrastructure Development Authority of the Punjab Act 2016, for planning, designing, construction and maintenance of infrastructure in the province, in line with the best international practices, to cope with futuristic development needs. IDAP is a specialized organization free of encumbrances prevalent in public sector departments ... [Read More]